Confidential — Investment Teaser 2026

Utility-Scale
Solar + Storage
in Romania

A 48 MWp photovoltaic project with 72 MWh integrated battery storage, fully permitted grid connection, and secured land rights in one of Romania's highest-irradiance regions.

48 MWp
Installed Capacity DC
72 MWh
Battery Storage
60k MWh/yr
Est. Annual Production
110 kV
Grid Connection
Discover More
A Ready-to-Build asset with all critical
milestones secured
CAT Solar Parc 3 represents a rare acquisition opportunity — a fully de-risked, grid-connected solar+storage project in Romania's booming renewable energy market.
Project EntityCat Solar Parc 3 SRL
LocationComloșu Mic, Timiș County
Installed Capacity (DC)48.084 MWp
Rated Power (AC)35.8 MW
BESS Component72 MWh / 0.5C
PV TechnologyJA Solar 550W Bifacial
Inverters179× Huawei 200 kW
Grid Connection110 kV LEA Carpinis-Jimbolia
ATR (Grid Permit)Obtained — April 2025
Land Area41.7 Ha (4 plots)
Land RightsSuperficiary — 37 years
Land Lease Cost€2,000/Ha/year
Six reasons this project stands out
Secured Grid Connection
ATR obtained for 110 kV high-voltage connection — the single largest bottleneck for renewable projects in Romania, with wait times exceeding 3 years for new applications.
Integrated BESS
72 MWh battery storage at 0.5C positions the project for premium valuation — BESS grew from 10 MW to 137 MW in Romania during 2024, with 5 GW targeted by end of 2026.
Prime Solar Irradiance
Timiș County — western Romania — benefits from above-average global horizontal irradiance, delivering an estimated 60,000 MWh annual production under pessimistic scenarios.
CfD Revenue Visibility
Romania's CfD scheme awarded 4.2 GW across two auctions. Solar prices: €35–54/MWh, providing 15-year revenue certainty backed by EU Modernisation Fund.
Fully Secured Land
41.7 hectares across 4 plots under superficiary contracts for 37 years at €2,000/Ha/year — eliminating land risk and providing long-term operational certainty.
Proven Market Momentum
Romania passed 7 GW cumulative solar in 2025 and targets 10 GW by 2030. The country attracted over €1.25 billion in EBRD-mobilized renewables financing since 2024.
From permitting to ready-to-build
Land Secured
2024
Environmental Permit
2024
ATR Obtained
April 2025
AC Permitting
Q1–Q2 2026
Building Permit
Q3 2026
RTB Stage
Q4 2026
Europe's fastest-growing solar market
Romania's renewable energy sector is experiencing unprecedented growth, driven by EU-backed CfD auctions, streamlined permitting, and massive institutional capital inflows.
7+ GW

Cumulative Solar Capacity

Romania surpassed 7 GW in 2025, with 1.2 GW utility-scale added — nearly double 2024's installations.

10 GW

2030 National Target

The updated NECP sets 10 GW solar by 2030, with 2.5 GW expected in 2026 alone.

4.2 GW

CfD-Backed Capacity

Two completed auctions surpassed the 3.5 GW national RRP target. Solar PV bids as low as €35/MWh.

€350 M+

EBRD Direct Financing

Since 2024, the EBRD has financed nearly 2 GW of renewable capacity in Romania, mobilizing over €1.25 billion.

5 GW

BESS Storage Target

Romania targets 5 GW of storage by end 2026. BESS grew 13× in 2024, from 10 MW to 137 MW.

38.3 %

Renewable Energy Target 2030

Raised from 30.7%, with an additional 44% target for 2035, aligned with EU decarbonization goals.

Competitive economics with
upside optionality
~€33.6 M
Total DEVEX + CAPEX
~€475 K/MWp
All-in Cost Per MWp
60,000 MWh
Annual Production Est.
€70–110 K
RTB Valuation Range /MWp

Grid Connection Costs

Transmission Installation (TR)~€1,790,000
Grid Reinforcement (N-1)~€337,600
Voltage Level110 kV
Connection LineLEA Carpinis–Jimbolia

Valuation Benchmarks

Romania Buy-Side (H2 2024)~€66,855/MWp
Romania Sell-Side (H1 2024)~€126,300/MWp
Transaction Premium+28.3% over buyer mid
BESS Premium Implied+15–25% over PV-only
72 MWh BESS unlocks
premium positioning
The integrated battery storage system transforms this from a standard solar asset into a hybrid dispatchable generation facility — commanding valuation premiums of 15–25% and opening multiple revenue streams.
72 MWh
Storage capacity at 0.5C discharge rate, charged exclusively from PV plant generation
13×
Romania BESS growth in 2024 alone — from 10 MW to 137 MW. Storage demand exploding.
€0
BESS now exempt from transmission, distribution, and cogeneration tariffs — EO 134/2024
4
Revenue streams: Energy arbitrage, frequency regulation, peak shaving, capacity market
€12 M/yr
Comparable BESS EBITDA benchmark — Econergy's 120 MW system at Rătești projects €12M annual EBITDA
5 GW
Romania's end-2026 storage target — massive gap between current capacity and ambition
Western Romania — strategic positioning
Municipality

Comloșu Mic, Timiș County

Region

Western Romania — Banat

Nearest City

Timișoara (~60 km)

Land Area

41.7 hectares across 4 plots

Grid Line

110 kV LEA Carpinis–Jimbolia

Solar Resource

Above-average GHI for Romania

Access

Flat agricultural terrain, road access

Interested in acquiring
CAT Solar Parc 3?
We invite qualified buyers, IPPs, infrastructure funds, and strategic investors to request the full confidential information memorandum and initiate discussions.


Email: office@catsolar.ro